| Date |
19.02.2010 |
| Location |
Upper
Witham Drainage Board Building (formerly police station
circa late 19th century). |
| Time |
19.00
to 21.40 |
| Moon
phase |
Waxing
crescent 26% of full |
| Ambient
temp |
0.1
C to +1.6 C
|
| Background
EMF |
0.1
to 0.4 mG |
| Members
present |
Ant,
Mark, Lynne, Boo, Mike, Jordan and Tony |
| Equipment: |
Ant:
Cam1: Outer building covering DVR1, DVR2: Kitchen, DVR3
Carried around during investigation and placed in room
next to Blue room during lock-off. |
|
Mark:
Cam1: Bedroom at top of stairs Cam2: Landing covering
1st room.
CCTV-Cam1: Large room 1st floor. Cam2: Top of stairs
pointing down. Cam3: Bedroom to the right of bathroom.
Cam4: Bedroom at top of stairs. |
|
Lynne:
DVR1: 1st floor corridor. DVR2: Carried around during
investigation and then placed in Blue room during lock
off. |
|
Boo:
Cam1: Bathroom covering landing. Cam2: Carried around. |
|
Mike:
Cam1: Room to the right of entrance. DVR1: Right hand
cell. DVR2: End room ground floor. |
| |
Jordan:
Cam1: Passage covering front door. |
| Notes: |
Tony
picked up on several names as did Lynne and Ant. Kitchen
area was very active. Nothing caught on still cameras
or camcorders. Several EVPs were recorded including
several direct responses to questions. |